Steps
fig: Fig. 3
cap: Horizontal Leading Edge
app: New Buildings
title: Horizontal Leading Edge Stripe
body: The entire horizontal leading edge of each step shall be marked with a solid and continuous stripe of photoluminescent material.
spec: Width | Min 1″ — Max 2″
spec: Length | Full length of the step
spec: Placement | Min 0″ — Max ½” from the leading edge of the step
spec: Overlap | No more than ½” down the vertical face of the step
—
fig: Fig. 3
cap: Modified Leading Edge
app: Existing Buildings — Option 1
title: Modified Horizontal Leading Edge
spec: Width | Same as new buildings
spec: Length | Within 2″ of both sides of step
spec: Placement | Min 0″ — Max 1″ from leading edge
spec: Overlap | Same as new buildings
—
fig: Fig. 4
cap: Side Edge Markers
app: Existing Buildings — Option 2
title: Side Edge Markings
body: Solid and continuous photoluminescent stripes on both horizontal sides of each step with returns extending along the leading edge.
spec: Side Width | Same as 2.2.1.1
spec: Placement | No further than 2″ from both sides
spec: Returns | Min 2″ parallel to leading edge; within 1″ of leading edge
spec: Overlap | Max ½” down the vertical face
note: Note | Side edge markings are NOT permitted in new buildings.